Shipping rough blocks to the Gulf, China and Turkey
Plan rough-block shipments around verified weights, suitable handling and clear delivery terms. Understand what to confirm before dispatch to the Gulf, China or Turkey.

A rough-block shipment should begin with a load plan. The IMO/ILO/UNECE CTU Code specifically identifies marble and granite blocks as heavy cargo requiring suitable blocking, bracing or lashing; fitting inside a container does not, by itself, establish transport suitability.1
Before comparing freight offers, establish an identified block, a confirmed handling arrangement and a precisely named delivery point. Keep the transport agreement connected to the purchase contract: Incoterms allocate important delivery responsibilities, but do not settle stone specifications, payment or ownership.2
Define the cargo before requesting freight
Give each selected block an identifier that follows it through the quotation, inspection record and dispatch documents. Record dimensions using an agreed measurement basis. EN 1467:2022 distinguishes gross, net and commercial dimensions; an outer envelope and a usable rectangular volume are different descriptions of the same irregular stone.3
For freight planning, provide the block’s actual outer dimensions, including projections, alongside its verified weight when available. Preserve the agreed commercial measurements separately. This keeps the dimensions needed for physical handling distinct from the measurements used to establish what the buyer is purchasing.13
As part of the agreed purchasing protocol, request photographs of accessible faces, records of visible fractures and disclosure of known repairs. Mark the intended cutting orientation where relevant, and ask the processor to approve the selection before packing. Establish these acceptance criteria in writing.23
Calculate weight, then check the actual equipment
For preliminary planning, marble density is often approximated at 2.7 tonnes per cubic metre. CEN guidance gives an illustrative range of approximately 2,600–2,900 kg/m³; the approximation is not a laboratory result for any particular stone.4

Consider a hypothetical rectangular block measuring 3.0 × 2.0 × 1.5 metres. Its geometric volume is 9.0 m³, giving an estimated stone mass of 24.3 tonnes at the assumed density. These are calculated planning figures, not available inventory or a verified shipping weight.4
Hapag-Lloyd’s representative 20-foot standard container lists a maximum payload of 28,130 kg. Its door opening is 2,340 mm wide and 2,292 mm high, smaller than the corresponding internal dimensions. The carrier stresses that specifications vary between containers.5
The illustrative block falls below that example’s payload ceiling, but this is only an initial comparison. Check the assigned equipment, the weight of support and securing materials, the proposed loading orientation, and clearance through the opening. Concentrated loading and securing remain separate constraints even when total cargo mass is acceptable.15
The loading method also needs scrutiny. The CTU Code warns that a forklift handling a heavy item can impose excessive concentrated loading inside a container. Assess the method used to place the block alongside the final stowage arrangement.1
Choose the handling method, not just the container type
An open-top container can address some height or top-loading requirements; a flatrack can accommodate certain cargo that does not suit an enclosed container. Neither description establishes unlimited carrying capacity. The CTU Code also notes that securing-point capacity can make standard containers unsuitable for some large, heavy pieces.1
Where suitable container arrangements cannot be established, ask for a separately engineered break-bulk proposal, including lifting, stowage and securing. Compare the complete handling sequence: collection, loading, any intermediate handling, discharge and placement at the receiving yard. Special equipment still needs a workable load-distribution plan.6
Before dispatch, have the receiving processor confirm access, unloading equipment and the proposed support arrangement. Include the packed dimensions and handling instructions in that review. The CTU Code’s guidance extends through the transport chain to those receiving and unpacking the cargo.7
For a packed container subject to SOLAS requirements, the shipper is responsible for providing verified gross mass, or VGM. This includes the stone, all packing and securing materials, and container tare. A dimensions-times-density estimate of the stone alone is insufficient. IMO permits weighing the packed container or using an approved method of weighing its contents and adding tare; VGM must be available in time for vessel stowage planning.8
Treat each destination as a specific delivery
Historical trade provides context, not booking confirmation. WITS records Iranian exports under HS 251511 (crude or roughly trimmed marble and travertine) to China, Turkey, the UAE and Oman in 2022. Those records establish past trade in that category, not a current route, carrier acceptance or transit time.9
The Gulf: specify the country, discharge point and final receiving address. Maersk’s operational update dated 23 September 2026 describes differing restrictions for dry, in-gauge and out-of-gauge cargo, alongside changes to landside services. Its regional arrangements are subject to availability and applicable law. This notice does not confirm a service for an Iranian stone shipment; obtain shipment-specific acceptance before committing to dispatch.10
China: request a quotation through to the actual processing location, with the discharge terminal, inland movement and unloading responsibilities identified. If the offer covers only a port, price the remaining stages separately. ICC guidance makes precise locations central to establishing delivery obligations and the extent of seller-arranged transport.211
Turkey: establish the transport mode in the offer. If road carriage is proposed, require confirmation of the actual crossing, carrier acceptance, vehicle suitability and delivery point; if sea carriage is proposed, require the equivalent port and inland arrangements. Do not apply maritime delivery terms automatically to an overland purchase: FCA and DAP accommodate different transport modes, whereas FOB concerns delivery aboard a vessel.1112
For every destination, separate scheduled departure, expected arrival and the contractual delivery obligation. ICC guidance warns that a shipment period under CIF is not automatically an undertaking to deliver at destination within that period.12
Confirm legal acceptance and customs treatment
Iran-related procurement needs current, transaction-specific review. OFAC guidance under Executive Order 13902 covers Iran’s mining and manufacturing sectors and describes potential exposure for certain transactions. The EU reimposed nuclear-related restrictive measures in September 2025, including financial and transport measures. Neither source alone determines the legal status of an individual stone purchase. Buyers should follow the laws of their own jurisdiction and applicable transaction requirements.1314
Confirm the proposed transaction with the relevant bank, carrier, insurer and qualified advisers before dispatch. A delivery term cannot resolve sanctions consequences or import prohibitions; ICC explicitly places those matters outside the scope of Incoterms.2
Customs descriptions also need precision. The published nomenclature distinguishes HS 251511, for crude or roughly trimmed marble and travertine, from HS 251512, for material merely cut into rectangular blocks or slabs. The latter includes some slabs and is not exclusively a rough-block category. Ask the destination broker to confirm the current local classification and applicable treatment for the actual goods.15
Have that broker provide the shipment-specific document list before loading. Ask which invoice particulars, packing details, origin evidence, transport documents and permissions are required, then reconcile them with the block schedule. Destinations differ, so the list is shipment-specific.211
Put risk transfer in the quotation
Write the chosen rule, exact place or port, and “Incoterms 2020” into the contract. The location matters as much as the abbreviation.2
| Term | Meaning relevant to a block purchase |
|---|---|
| FCA, named place | Suitable across transport modes. At the seller’s premises, delivery includes loading onto buyer-arranged transport.11 |
| FOB, named shipment port | Risk passes when the goods are aboard the nominated vessel.12 |
| CIF, named destination port | Seller arranges freight and required insurance, but risk passes at shipment, not arrival.16 |
| DAP, named destination | Seller delivers at the named destination, ready for unloading; the buyer handles import clearance.11 |
Where a container is handed to a carrier before vessel loading, ICC Academy guidance favours considering FCA over FOB. The delivery point should reflect the actual handover.12
Keep quality acceptance, payment milestones, transfer of ownership and remedies in separate contract provisions. For insurance, request the actual policy terms and confirmation that the proposed cargo and journey are accepted; “CIF” alone is not a complete account of the parties’ commercial protection.216
Compare the cost through to the yard
Request an itemized comparison covering collection, loading, securing, inland carriage, export handling, main transport, destination handling, clearance, taxes where applicable and final unloading. Mark each item as included, excluded or awaiting confirmation. That makes the cost allocation under the selected delivery term reviewable.211
Ask separately about storage, container-use charges, empty return arrangements and any disruption surcharges. Maersk’s September notice illustrates why these require attention: it describes emergency freight charges, storage provisions and altered empty-container returns. Those arrangements are carrier- and situation-specific, not standard charges for every stone shipment.10
Before release, bring the selection record, packing approval, weight evidence, booking acceptance and receiving plan together. On arrival, compare block identity and visible condition with the dispatch record before processing, and document discrepancies under the agreed notification procedure. The contract must define the remedies and deadlines for that acceptance process.237
For rough-block inquiries, contact MAMSALEH by WhatsApp or phone through mamsaleh.com.17
Sources
Superscript numbers in the text refer to these sources. All web sources accessed 2026-09-29. Publication or edition dates are given where established.
- 1IMO/ILO/UNECE. CTU Code, section 7.2: Suitability for the cargo (opens in a new tab). 2014.
- 2International Chamber of Commerce. Incoterms 2020: questions and answers (opens in a new tab). Undated online guidance.
- 3CEN / Slovenian Institute for Standardization, via iTeh. EN 1467:2022: Natural stone: Rough blocks: Requirements (opens in a new tab). 2022.
- 4CEN, via iTeh. CEN/TR 17024:2017: Natural stone: Guidance for use of natural stones (opens in a new tab). 2017.
- 5Hapag-Lloyd. 20-foot standard-container specifications (opens in a new tab). Undated live equipment page; specifications are representative.
- 6Hapag-Lloyd. Container Packing guide (opens in a new tab). October 2011; technical background.
- 7United Nations Economic Commission for Europe. IMO/ILO/UNECE Code of Practice for Packing of Cargo Transport Units (opens in a new tab). Online overview of the 2014 CTU Code.
- 8International Maritime Organization. Verification of the gross mass of a packed container (opens in a new tab). Undated guidance; requirements effective in 2016.
- 9World Bank WITS / UN Comtrade. Iran: HS 251511 exports by destination, 2022 (opens in a new tab). Historical trade data.
- 10Maersk. Middle East Operational Update 49 (opens in a new tab). 23 September 2026.
- 11International Chamber of Commerce. Incoterms 2020: rules for any mode or modes of transport (opens in a new tab). 2019/2020 edition.
- 12ICC Academy. Incoterms 2020: CFR vs FOB and the title transfer myth (opens in a new tab). 2020.
- 13US Department of the Treasury, Office of Foreign Assets Control. FAQ 831: Iranian economic sectors under Executive Order 13902 (opens in a new tab). 7 December 2020.
- 14Council of the European Union. Iran sanctions snapback: Council reimposes restrictive measures (opens in a new tab). 29 September 2025.
- 15US Census Bureau. Schedule B, Chapter 25 (opens in a new tab). 2017 edition; cited for commodity descriptions, not destination-specific tariffs.
- 16ICC Academy. Incoterms 2020 C rules vs D rules: Risk transfer explained (opens in a new tab). 20 January 2026.
- 17MAMSALEH. Scatto & Bianco: product and supply information. mamsaleh.com, 2026.